Within the projects on topographical studies for the design of infrastructure objectives, measurements were carried out using state-of-the-art modern equipment using both classical and photogrammetric methods, thus providing the designer with clear and precise information about the objectives to be worked on.
Among the objectives that were the subject of the contracts, we mention:
▪ Development and regeneration of the Morii corridor and neighboring areas on the section between Buftea and București streets and the creation of a sustainable mobility corridor by developing the Onisifor Ghibu and Nicolae Cristea streets, Cluj-Napoca, based on the walkable and smart-city concept
▪ Establishment of a light ring road around Iasi Municipality
▪ North mobility corridor – Oașului – Răsăritului Bridge – Răsăritului – Câmpul Pâinii – Ira Bridge, Mun. Cluj Napoca, jud. Cluj
▪ Rehabilitation of the Hobanata footbridge made of reinforced concrete over the Crișul Repede river between Libertății str. and Emanuil Gojdu alley, in Oradea municipality
▪ Strengthening and rehabilitation of bridges over the Prut River, located on the border with the Republic of Moldova: Bridge on DN 26A km 0+500, Oancea-Cahul, jud. Galați; Bridge on DN 24 km 219+527, Sculeni-Sculeni, jud. Iași; Bridge on DN 24B km 42+092, Albița-Leușeni, jud. Vaslui
▪ Capital repair Bridge on DN 3B Km 0+822 over the Canal at Călărași, Călărași County
▪ Bridge on DN 2H km 4+776 over Suceava River, Milișăuți, Suceava County
▪ Consolidation of DN 7C slopes, Sibiu County
▪ Underground/underground pedestrian overpass at the intersection of DN 1 and Crinului Street (Poiana Țapului);
▪ Underground pedestrian crossing at the intersection DN 1 with Telecabinei Street (Bușteni)
▪ Underground pedestrian crossing at the intersection of DN 1 and Panduri Street (Predeal)
▪ Realization of road underpass at the intersection DN 1 with Prahovei Street (Azuga)
▪ Bridge on DN15, Km 300 +981, over Bistrița River, Pangarati, jud. Neamț
The works were carried out according to the requirements of the specifications, topographic measurements were performed for all the elements identified in the field: buildings, utilities constructions, postal numbers, property boundaries, road infrastructure elements, railway lines or watercourses, green areas, building networks).